Commit Graph

11 Commits

Author SHA1 Message Date
34c2b436f0 docs: Phase 5 acceptance, deployment, operations and phase report
Record the task/quota exception matrix (isolated fault injection) results,
the admin quota concurrency fix, the isolated restore drill (business/CMS/audio,
with the pre-existing missing-audio finding), upstream security launch blocker,
and remaining minor items. Each item marked pass / fail / awaiting-external with
test version and evidence. Do not mark reliability/launch-blocking items complete.
2026-09-10 05:01:27 +08:00
956862215d docs: record P4-04..P4-07 admin acceptance and leftover items 2026-09-10 02:59:36 +08:00
24766c8346 docs: record Phase 4 CMS boundary and blocker 2026-09-09 19:30:24 +08:00
d9a491ef43 fix: finalize Phase 3 V1 minimum and worker recovery 2026-09-09 15:00:59 +08:00
f814f35f41 docs: record Phase 3 TTS boundary and tests 2026-09-09 00:48:28 +08:00
487a11e5f1 docs: record browser auth acceptance and TTS gap 2026-09-09 00:29:31 +08:00
4b3e82568a docs: record Phase 2 authentication deployment 2026-09-09 00:06:16 +08:00
6f3b0488ed docs: standardize deployment packaging checks 2026-09-08 23:18:25 +08:00
865f1cae06 docs: record LAN skeleton deployment 2026-09-08 18:14:26 +08:00
30cec549c1 feat: add Phase 1 website skeleton and design system 2026-09-08 17:20:15 +08:00
c26164a318 docs: complete Phase 0 audit baseline 2026-09-08 15:29:09 +08:00